FLUXYS
VTN II Lot 1
Construction and installation of a natural gas pipeline ND1000 between the station of Opwijk and the station of Landen (± 83 km)
ANDERE PROJECTEN
VTN II Lot 1
Construction and installation of a natural gas pipeline ND1000 between the station of Opwijk and the station of Landen (± 83 km)