GASUNIE
Borgsweer-Midwolda
Construction of a 48” gas transportline between Borgsweer and Midwolda with a total length of ca. 12,7 km and facilities (Netherland territory), and the construction of the 48rdquo; gas transportline Rysum - Entrance Eemstunnel with a total length of ca. 2,4 km (German territory)
The project comprises :
- Netherlands territory: 7 trenchless crossings and 2 culvert siphon
- German territory: 3 trenchless crossings
- One AGI on Netherland territory
- Extension of the station located at Rysum (Germany)
ANDERE PROJECTEN