GASUNIE

Wijngaarden-Westerschelde Oost

Construction of the 48” HP gas transport pipeline between Wijngaarden and Westerschelde Oost

The pipeline is located over a total length of plusmn; 50 km in the ldquo;Buisleidingenstraatrdquo;. The construction comprises as well as different culvert syphons, open crossings, covering-overs :

- Construction in an existing tunnel ( 1.900 m)
- 8 HDD (5.400 m)
- 3 trenchless crossings of railways (240 m)
- 8 pipe jackings (851 m)
- 31 trenchless crossings (708 m)
- 7 AGI's

Img 2872
Img 5171
Img 4948
Img 3339
Img 3092
Img 2991
Img 4956
Img 6284
Img 5156
Img 4692
Img 3165
Img 3004

ANDERE PROJECTEN