SOWAER

Cubber & Stockis Phase 2

Installation of pipelines by pipe jacking DN1800 and 1270 m long, as part of the realisation of the second phase of the stormwater drainage from the areas Cubber & Stockis Lot 2 at the airport of Liège.

00116 001 Sowaer Cs 2 L2 0015
00116 001 Sowaer Cs 2 L2 0004
00116 001 Sowaer Cs 2 L2 0019
00116 001 Sowaer Cs 2 L2 0003
00116 001 Sowaer Cs 2 L2 0037
Img 20210203 170108 Large
Whats App Image 2021 06 17 At 07 53 59
Img 20210617 095602 Large
1615545860677
Img 20210125 165132
Img 20210125 165740
Img 20201210 082330
00116 001 Sowaer Cs 2 L2 0083
Img 20210511 083422

ANDERE PROJECTEN