SOWAER

Cubber & Stockis Phase 2

Installation of pipelines by pipe jacking DN1800 and 1270 m long, as part of the realisation of the second phase of the stormwater drainage from the areas Cubber & Stockis Lot 2 at the airport of Liège.

1615545860677
Img 20210125 165132
Img 20210125 165740
Img 20201210 082330

ANDERE PROJECTEN