- Home /
- Projects /
- Tunnelling /
- SOWAER
SOWAER
Cubber & Stockis Phase 2
Installation of pipelines by pipe jacking DN1800 and 1270 m long, as part of the realisation of the second phase of the stormwater drainage from the areas Cubber & Stockis Lot 2 at the airport of Liège.
ANDERE PROJECTEN