SOWAER

Cubber & Stockis Phase 1

Installation of pipelines by pipe jacking DN1800 and 2x 635m long, as part of the realisation of the first phase of the stormwater drainage from the areas Cubber & Stockis in Liège.

ANDERE PROJECTEN