- Home /
- Projects /
- Tunnelling /
- SOWAER
SOWAER
Cubber & Stockis Phase 1
Installation of pipelines by pipe jacking DN1800 and 2x 635m long, as part of the realisation of the first phase of the stormwater drainage from the areas Cubber & Stockis in Liège.
ANDERE PROJECTEN