UTE ASCH-MARCO

Madrid

The Pozuelo de Alarcón Rainwater Collector-Interceptor
Construction of a tunnel with an internal diameter of 4.50 m and a length of 4.50 km in Pozuelo de Alarcón, a suburb of Madrid. The tunnel crosses four construction pits, along which floodwaters will flow towards the Manzanares (Madrid's main river). The tunnel is being built using an EPB tunnel boring machine and concrete segments.

Capture
Whats App Image 2023 06 06 At 16 29 31
P1000809 Large
Img20230731120451 Large

ANDERE PROJECTEN